HZS商品混凝土攪拌站養護周期劃分:
HZS commercial concrete mixing station maintenance cycle division:
日常維護與保養1.每班開機前應做工作1) 檢查各骨料倉是否裝滿.
Daily maintenance and maintenance 1. before the start of each class should do the work 1) to check whether the aggregate is full.
2) 檢查水池水位情況,將水池裝水至上限位.
2) check the water level of the pool and limit the water to the top of the pool.
3) 檢查各氣路是否有漏氣、漏水現象,如有,則及時拆卸、清洗、更換,直至 不漏為止.有無軟管破損、老化.
3) check whether there is leakage and leakage of each gas road. If there is, remove, clean and replace it in time until no leakage.
4) 檢查各氣動蝶閥動作是否準確到位,若關閉不嚴,應及時調整好至關閉良好.
4) check whether the action of each pneumatic butterfly valve is accurately in place, if the closure is not strict, it should be adjusted well to good close in time.
5) 檢查各減速箱內油量是否到位,油量不得過多或過少(按減速機說明書要 求).
5) check whether the amount of oil in the reducer is in place, the amount of oil should not be too much or too little (according to the requirements of the reducer's manual).
6) 檢查螺旋機各加油點是否已加潤滑油脂.
6) check whether the oil filling points of the screw machine have been added to grease.
7) 檢查各輸送皮帶松緊是否合適、跑偏是否嚴重,若不行則要求先空轉運行并 調整后部張緊裝置至合適,注意此時應關閉骨料倉門.
7) check whether the belt tightness is suitable and whether the deviation is serious. If not, then it is required to run around first and adjust the rear tensioning device to the right place. Pay attention to closing the aggregate bin door at this time.
8) 檢查皮帶機托輥轉動是否靈活,否則應拆下清洗或更換內軸承,直至轉動靈 活.
8) check the flexibly of the rollers of the belt conveyor, otherwise the inner bearings should be removed or replaced until the rotation is flexible.
9) 檢查氣動兩聯件中過濾器的積水情況,積水量多需放出,油霧氣器中油量是 否夠,不夠則應加夠,否則將影響氣路的正常使用.
9) check the accumulating water of the filter in the two pneumatic parts. The amount of water needed to be released and the amount of oil in the oil mist device is enou |