1、XPS擠塑板必須確保在自然環(huán)境條件下陳化滿足42天的要求,如工期較緊,則應(yīng)采取在60℃蒸汽養(yǎng)護(hù)條件下陳化5天的備用措施。以免因XPS板陳化期不足,導(dǎo)致上墻后繼續(xù)收縮,造成抗裂保護(hù)層及裝飾面層開裂、翹曲、變形。
1, XPS Extrusion board must ensure that under natural conditions of aging, to meet the requirements of 42 days, such as the duration is tight, should be taken at 60 degrees steam curing conditions, aging 5 days of standby measures. The XPS board so as to avoid ageing, resulting in the wall continues to shrink, causing crack protective layer and a decorative surface layer cracking, warping and deformation.
2、XPS擠塑板粘貼時(shí),平整度調(diào)整應(yīng)采用橡皮錘敲擊的方式,不得采用上下、左右錯(cuò)動(dòng)的方式調(diào)整,以免因擠塑板的錯(cuò)動(dòng)致使粘結(jié)劑溢進(jìn)板間的縫隙內(nèi),形成冷橋,將對外保溫系統(tǒng)的保溫效果造成較大的負(fù)面影響。
2, XPS extruded plate paste, smoothness adjustment should adopt rubber hammer way, using and so on dislocation mode shall not be adjusted, so as to avoid the dislocation resulting in extruded plate binder spilled into the plate in a gap between the formation of cold bridge, the external insulation insulation effect system caused great negative impact the.
3、XPS擠塑板粘貼施工時(shí),為保證陽角的垂直度,在陽角處施工時(shí),應(yīng)使XPS板適當(dāng)超出墻面一定距離,待XPS板全部貼貼完后,再進(jìn)行統(tǒng)一彈線后切割,并打磨平整。
3, XPS board paste construction, to ensure the verticality of yang angle, Yang corner construction, should be appropriate beyond a certain distance from the wall plate XPS, XPS board to be posted after all, then the unified elastic line after cutting and polishing.
山東非凡新型建材有限公司
聯(lián)系人:高經(jīng)理
郵箱: 285132697@qq.com
電話:400-009-6717
手機(jī): 15165012015
QQ: 285132697
地址:山東省濟(jì)南市黃河大廈4樓
諾商基于多年的優(yōu)化經(jīng)驗(yàn)和品牌基礎(chǔ)推出的諾商商道系統(tǒng),諾商信息您身邊的互聯(lián)網(wǎng)專家! |
 |
|